On the day you get the keys to a new Dutch home, the door opens but the electricity, gas, water and internet may all depend on contracts that nobody has signed yet. Unlike a single move-in call, the Netherlands splits these across an energy supplier, a grid operator, a water company and an internet provider, and whether you contract each one yourself depends on your type of home.
This guide lays out the first week in order: what to arrange, where, and with what in hand. For energy comparisons it follows the approach of ACM ConsuWijzer, the consumer guidance run by the Netherlands Authority for Consumers and Markets, and it adds the prices and wording shown on providers' own pages. Everything was checked on 7 November 2026. The 2027 grid fee increase and the end of solar net metering are covered in a separate article, so this one only links to it.
The main sources were ACM ConsuWijzer on electricity and gas and on telephone, internet and TV, Rijksoverheid on applying for drinking water, the water company Dunea and the fibre providers' own pages. Expat media such as Xpat.nl, The Hague International Centre and ACCESS Netherlands helped confirm the overall steps.
| What you will learn | The short answer |
|---|---|
| What to check first | Whether rent includes utilities (inclusief) or not (exclusief) |
| Who sells energy | A supplier you choose; the grid operator is fixed by area |
| Price types | Fixed, variable, dynamic; only fixed can carry an exit fee |
| Water | Set by address; apply from the day you get the keys |
| Internet | Depends on the line at your address; contracts last at most 2 years |
| If you are unsure | ACM ConsuWijzer, your water company, your grid operator |
1. Week one at a glance: what, when and where
The reasons come in later sections, but with the order in mind you are much less likely to sign the wrong thing in a hurry.
1-1. The timeline
This table assumes a rental where utilities are not included, or a purchased home. For rent that includes utilities, some rows become your landlord's job (see section 3).
| When | What to do | Who to contact | What to have ready |
|---|---|---|---|
| A few weeks before | Check which lines reach you and order internet | Internet provider | Address, move-in date |
| Before moving in | Pick a supplier and order gas and electricity | Energy supplier | Move-in date, address, payment method |
| Key day | Photograph electricity, gas and water meters | Yourself | Dated photos |
| From key day | Apply for water | Your water company | Water meter reading |
| Within 5 working days | If the meter is an older type, pass on the reading | Energy supplier | Photo and numbers |
| After moving in | Be home for the internet installation | Internet provider | A date you can attend |
| After moving in | Save contracts, start dates, cancellation rules | Yourself | Confirmation emails |
Key day anchors everything. Energy is decided before it, water starts from it, and internet needs the longest lead time. The published pages do not state how many days pass between ordering and activation, so ordering a few weeks ahead, ideally a month or more, is our own cautious suggestion.
1-2. The sequence as a figure
2. Who is who: supplier, grid operator, water company, internet provider
The first surprise is that "the electricity company" is two companies. One sends the bill and one looks after the cables, and only the first is yours to choose.
2-1. Supplier versus grid operator
According to ACM ConsuWijzer, the grid operator (netbeheerder) owns the gas pipes and power cables and connects your home to the network. It also handles meters and is the first call for outages and gas leaks. You cannot choose it: there is one per area, and it changes only if you move to another area. You can look up yours by postcode and house number at Mijnaansluiting.nl. For a power cut or gas leak, ACM's page gives 0800-9009.
The supplier (energieleverancier) sells the energy, signs the contract, sends the bill and is the company you switch. ACM notes that network costs are included in the supplier's bill, so the supplier is also your contact for those questions. Suppliers need an ACM licence.
2-2. Water and internet
Your water company (drinkwaterbedrijf) is set by your address. Rijksoverheid says you can check whether the water company changes at the new address on the website of Vewin, the sector association. It is not something you shop around for.
For internet, the line at your address decides who you can choose. ACM explains that cable has one provider per area, DSL uses KPN's copper phone line, and fibre (glasvezel) has been laid by many providers.
| What you contract | Who handles it | Can you choose? | How to check your address |
|---|---|---|---|
| Selling energy | Supplier | Yes | Comparison site by postcode |
| Cables, pipes, meters | Grid operator | No (one per area) | Mijnaansluiting.nl |
| Water | Water company | No (set by address) | Vewin map |
| Internet (cable) | One provider per area | In practice no | Provider postcode check |
| Internet (fibre) | Sometimes several | Depends on address | Provider postcode check |
Free choice is limited to energy suppliers and, where several fibre providers share a street, internet providers.
3. Your type of home decides which contracts are yours
The same "I rented a place in the Netherlands" can mean four different sets of tasks. Read the lease first for whether the rent is inclusief (utilities included) or exclusief (not included). The Hague International Centre advises checking this first.
3-1. A table by housing type
This table is a general guide. Your own lease is the authority.
| Housing type | Energy | Water | Internet | First step |
|---|---|---|---|---|
| Rental, utilities included | Often the landlord's contract | Often the landlord's contract | Often a separate contract | Read what is included and how it is settled |
| Rental, utilities excluded | Your own supplier contract | You apply to the water company | Your own contract | Pick a supplier before moving |
| Room in a shared home | Possibly the household's contract | Same | Possibly the household's | Clarify whose name it is in and how costs are split |
| Owner-occupied | Your own contract | You apply | Your own contract | Agree meter readings at handover |
| Apartment with shared heating | May be part of the building contract | May be billed together | May be a building line | Ask the VvE (owners' association) or landlord |
The number of contracts you personally need changes sharply depending on the first column. ACM has a separate page on district and block heating, which this article does not cover.
3-2. If utilities are included in your rent
Even with an inclusive lease, actual usage shows up in the annual settlement. The timing of the service charge statement (jaarafrekening servicekosten) and how overpayments and shortfalls work are covered in the household bills calendar.
Whether internet is part of "included" varies by lease and by wording. Ask the landlord in writing whether it is.
3-3. If you buy
When you buy, agree the meter numbers with the previous owner on the handover day. Taking the photos together is the most reliable way. For water, apply to your water company.
4. Gas and electricity: how to choose, in order
Choosing a supplier comes first. ACM's guidance on choosing a supplier starts by checking your annual usage and current payments, and warns against deciding on a sales call. Your last annual statement (jaarafrekening) is a useful reference.
4-1. Using comparison sites
ACM suggests entering your postcode, usage, whether you have solar panels and your preferences, comparing several sites and checking at different times. Ask whether a site lets you describe your situation, how it compares, whether it is complete and whether paid adverts appear first.
Look beyond the unit price at the fixed supply charge (vaste leveringskosten). ACM explains that a high fixed charge with a low unit price helps heavy users but not light ones. Discounts often apply only to the supply charge and not to network costs or taxes.
4-2. A contract follows you, not the address
ACM says some suppliers let you take your current contract to a new address and may let you run it at both addresses for a while. If gas and electricity come from different suppliers, contact each one. When a contract ends you have to find a new one.
The expat site Xpat.nl advises telling your supplier your new address at least two weeks before moving so the contract is active on key day. The page carries no date and is not an official deadline, so treat it as a rule of thumb.
4-3. Payment and documents
The Hague International Centre lists ID (not a driving licence), bank details and sometimes a rental contract as usual requirements. ACCESS Netherlands says monthly direct debit lowers the risk of late payment and is often cheaper. Our bank account guide covers opening an account.
5. Fixed, variable and dynamic: three kinds of price
Energy prices come in three main forms. This section follows ACM ConsuWijzer's guidance on choosing a supplier and its explanation of the bill.
5-1. Comparison table
| Fixed | Variable | Dynamic | |
|---|---|---|---|
| How the price is set | Unit price fixed for the term | Supplier can change it | Follows the wholesale market |
| How often it changes | Not during the term | Many suppliers change around 1 July and 1 January (ACM) | Electricity every 15 minutes to a day; gas daily |
| Typical term | E.g. 1 or 3 years | Usually open-ended | Usually open-ended |
| Exit fee | Possible if you leave early | None | None |
| Price rises | Not felt during the term | Felt | Felt |
| Price falls | Not felt | Felt | Felt |
| Suits | People who want predictability | People who want flexibility | People who can shift usage |
In short, fixed buys certainty; variable and dynamic buy flexibility.
ACM adds that fixed contracts are often more expensive than variable or dynamic ones. ACM's page on supply charges (rechecked 7 November 2026) gives the example that a variable model contract (modelcontract) may not change its rates more than four times a year. Other variable contracts do not necessarily share that cap. For dynamic contracts the supplier has to explain the risks before you sign.
5-2. Who dynamic contracts suit
ACM's energy monitor of 15 November 2024 reported that more than 5% of households were on a dynamic contract, up slightly. ACM said they suit households with a financial buffer who can adjust usage, for example by charging an EV at cheaper times or pausing a heat pump. It counted 32 suppliers offering dynamic contracts. This is 2024 data and the current picture may differ.
5-3. How often prices move
Figure 3 shows how often each type changes. It is a sketch of the unit of change, not of real intervals.
5-4. What happens when a contract ends
ACM's bill guidance says that when a fixed term ends the contract switches to a variable rate, and the supplier must tell you the new price at least 30 days ahead. For variable rate changes, suppliers must give at least one month's notice. Check your contract for when any welcome discount stops.
6. Exit fees and notice periods: moving does not change the rules
If your plans change soon after moving in, the cost depends on the contract type. This section follows ACM's page on cancelling an energy contract.
6-1. When an exit fee applies
An exit fee (opzegvergoeding) applies only when all three of these hold: the contract has a fixed term, the term has not ended when you cancel, and the contract says so. ACM states that the same conditions apply if you cancel because you move, emigrate or move in with someone.
| Situation | Exit fee |
|---|---|
| Cancelling a fixed contract inside its term | Possible |
| Fixed contract after the term ends | None |
| Variable contract | None |
| Dynamic contract | None |
| Contract does not explain the calculation | None |
If you are unsure how long you will stay, starting with variable or dynamic and moving to fixed later is one way to keep exit costs at zero.
6-2. How it is calculated, and notice
ACM gives the formula: remaining usage multiplied by (your current price minus the supplier's new price for a contract of the remaining length). If market prices have risen there is no loss for the supplier, so no fee. In ACM's worked example, 800 kWh left and a unit price that fell from €0.45 to €0.25 gives €160 for electricity. This is ACM's illustration, not a real quote.
The notice period is written in the contract and can be at most one month, counted from the day after you give notice. A written calculation is valid for two months. If electricity and gas are one contract you cannot cancel only one.
6-3. The 14-day cooling-off period
ACM says energy contracts carry a 14-day cooling-off period (bedenktijd). If the supplier did not tell you about it, the period can run up to a year. Within it you can cancel by letter or email at no charge. The page does not say how the start of supply interacts with the period, so ask the supplier about your own start date.
7. Meter readings: what to do on move-in day
Dutch homes have either an older meter or a smart meter (slimme meter). ACM says that with a smart meter the grid operator reads it and passes the figures to your supplier, so you do not have to report readings yourself unless you opted out of automatic reading.
7-1. If your meter is an older type
Pass the reading to your supplier within 5 working days of moving or switching, by the method the supplier sets (form, phone, online or email). ACM recommends photographing the reading in case of a later dispute.
If you do not report it, the supplier estimates your use from the address's standard annual usage (SJA), which is based on the last two to three years and takes weather into account. That estimate can include some of the previous occupant's use.
7-2. Checking the final bill
After a move or switch, the final bill should arrive within 6 weeks. Check that it matches the reading you gave and whether it says the figures are estimates. If you disagree, write to the supplier with your photos. ACM says the supplier has 8 weeks to decide and you do not have to pay in the meantime.
| Situation | Tell whom | Deadline | Notes |
|---|---|---|---|
| Move-in (older meter) | New supplier | 5 working days | Attach a photo |
| Move-in (smart meter) | Not needed | Read automatically | Report yourself if you opted out |
| Move-out | Old supplier | 5 working days | Ideally photograph with the next occupant |
| Checking the final bill | Old supplier | Arrives within 6 weeks | Complain if it does not |
| Complaint reply | Supplier | 8 weeks to decide | No payment meanwhile |
On smart meters, Milieu Centraal says installation is free when your household's turn comes, while asking for an earlier date may cost a fee from the grid operator.
8. The monthly advance and the annual settlement
Dutch energy bills run on a fixed monthly amount and a yearly true-up. The monthly amount is the termijnbedrag and the yearly statement is the jaarafrekening.
8-1. How the termijnbedrag is set
ACM explains that the supplier estimates the year's cost from energy prices and your past usage, then divides by twelve. In a new home the estimate may rest on a previous occupant's usage and miss yours.
You can usually change the amount in the supplier's app or site. If not, email or write with the amount you want and why. ACM warns that setting it too low means a large payment at the annual settlement, and points people who struggle to pay to debt assistance (schuldhulpverlening).
8-2. What the annual settlement does
An overpayment is refunded or deducted from later payments; a shortfall comes as an additional bill. A supplier needs a good reason to raise your monthly amount, such as variable prices rising faster than expected or more usage. A raised monthly amount does not need 30 days' notice; the 30-day notice applies to changes in the rate.
For the 2027 grid fee increase and the end of solar net metering, see our article on Dutch energy bills in 2027. For the year as a whole, the household bills calendar and the cost of living guide help.
9. Water: no choice of company, apply from key day
Water is the one utility you cannot shop for. Rijksoverheid says you must always report a move to the water company, and that you can check on Vewin's site whether the company changes at your new address.
9-1. Same company or a different one
| New address | What to do |
|---|---|
| Same water company as before | Report the move and give meter readings for old and new address |
| Different company | Tell the old company you are leaving (cancellation is possible at any time) and apply to the new one, which you can do from key day |
Either way a final bill for the old address follows.
9-2. Dunea in The Hague
Dunea supplies water around The Hague. Its moving page says to wait until key day, read the water meter that day and enter it on the application page. From key day the water costs are yours.
If the new home is not yet connected to the water main, you can apply for a connection through Mijnaansluiting.nl. Cancellation for the old address must be reported within 60 days of handing back the keys, after which the date you report becomes the end date. Applying online brings an immediate confirmation email and the water contract within 3 working days. Cancelling is free.
9-3. When guidance disagrees
The Hague International Centre says the bill usually switches automatically when your lease or mortgage begins, so you normally do not need to contact the water company. Rijksoverheid and Dunea, however, describe applying. These do not match, and what really applies may depend on the company and your contract. This article follows the official steps and suggests applying on key day to be safe.
There is also a separate water authority tax (waterschapsbelasting), covered in the household bills calendar.
10. Internet: check the line first, then compare providers
Check which lines reach your address before you compare providers. Doing it the other way round leads to choosing a provider that cannot serve you.
10-1. Cable, DSL and fibre
| Line | How it is offered | Watch out for |
|---|---|---|
| Cable (coax) | One provider per area, e.g. Vodafone Ziggo, Caiway, Delta | You may have no choice of provider |
| DSL (copper) | KPN-owned phone line | Being replaced by fibre in many areas |
| Fibre (glasvezel) | Laid by many providers; several may share a network | Fewer choices where fibre has not been laid |
These come from ACM ConsuWijzer. ACM adds that on the Open Dutch Fiber network, Odido is the only provider for the first year after opening, after which others can offer service.
Fibre often arrives in three steps: cable laid in the street, an offer to connect your home, then an offer for a contract. ACM says you may decline the connection, but your current contract may then no longer be available.
10-2. Installation and being home
KPN says the street work takes one day and connecting the home takes roughly half a day. Open Dutch Fiber says about 45 minutes per apartment and two to three hours for a house. Someone must be home, and in apartment buildings the owner or the VvE must give permission.
Ziggo's page says a technician visit is free for up to 8 weeks after receiving the package or after moving. None of the pages state the total time from ordering to activation.
10-3. A price example: KPN fibre
KPN's fibre page (checked 7 November 2026; the prices carry no date) shows a promotional €35 per month for 12 months, against regular prices from €44 to €70 depending on speed. It says you cannot lower the speed during the contract, only raise it, and that after the contract you can change plans monthly. Snel 100 is only offered at addresses without fibre. The fibre connection itself is shown as free.
Figure 4 shows KPN's regular prices, with the promotional price as a dashed line.
The figure shows that once the promotion ends, the same speed costs more per month.
On Ziggo's page we could not confirm a monthly price per plan. It shows promotional banners mentioning 12 months and says the plan can be changed monthly. Because cable usually means one provider per address, check the price through Ziggo's postcode check.
10-4. After the promotion ends
DutchNews reported on 16 January 2025 that, according to ACM, the initial contract period had ended for 79% of internet contracts. Average monthly fees were €44 for plans under 100 Mbps and €41 for 250 to 750 Mbps. A DutchNews report of 9 February 2026 says ACM warned that long-standing customers can pay up to €10 per month more than the advertised price of comparable plans, because introductory discounts end and annual inflation adjustments are added.
11. Internet contract length, renewal and cancelling
As with energy, knowing the term and renewal rules now saves surprises later. This follows ACM ConsuWijzer's guidance on cancelling a telecom subscription.
11-1. The rules
| Topic | ACM's guidance |
|---|---|
| Contract length | Often 1 or 2 years; a provider can hold you for at most 2 years |
| After the fixed term | You can cancel at no cost; notice is at most one month |
| Automatic renewal | The provider must notify you at least one month before the term ends |
| After renewal | You can cancel at any time with one month's notice |
| How to cancel | The same way you signed up, such as online |
| Adding services | Adding TV with the same provider does not move the end date |
The last rows are the easiest to miss. If you signed online, you should be able to cancel online.
11-2. If you move mid-contract
ACM says that if you want to cancel because you move during the term, check the provider's terms. Some charge the remaining months and others have special moving rules. Consumentenbond advises checking that the provider serves your new address and how long your current contract still runs.
11-3. Fibre signed before it is built
Where fibre has not been laid, a provider may sign residents first and build once enough people join (vraagbundeling). ACM says the contract must state the service, the delivery date, that it will not go ahead if too few join, the price and the term. If you sign by phone, online, at the door or in the street you have a 14-day cooling-off right, and if the delivery date is missed you can accept a new date or end the contract.
11-4. Speed and modems
ACM requires fixed-internet providers to state a minimum, normal and maximum speed. The normal speed must be reached in at least 8 of 10 measurements at home. Measure with other devices off and your computer on a cable.
A provider cannot force a particular modem or router. But fibre comes in two types, PTP and PON, and a PTP modem does not suit PON, so a provider can refuse one. IP-TV decoders can also be refused.
12. If you are used to utilities being bundled or set up for you
If your previous home had energy, water and internet bundled into the rent or arranged by a landlord, the number of separate contracts here may feel unusual. These are differences in set-up, not a ranking.
| Item | If utilities were bundled or arranged for you | In the Netherlands |
|---|---|---|
| Energy | One bill or one call to switch on | Supplier and grid operator are separate; the contract is in your name |
| Meters | Someone else reads them | Smart meters are read automatically; older types you report |
| Water | Often included | Set by address; apply from key day |
| Internet | Often chosen separately | Line and provider are narrowed by address; terms up to 2 years |
| Cancelling | Depends on the contract | ACM says notice is at most one month |
Your own situation may differ. A contract that follows you rather than the address can be a plus if you move often.
13. Common pitfalls and what not to do
| Do not | Why |
|---|---|
| Move in with no contract and leave it | The start date is unclear and billing for the earlier period can become a dispute |
| Skip the meter photos | A bill based on estimates has no evidence behind it |
| Agree to a contract on a sales call | ACM advises against deciding on the spot |
| Compare suppliers by unit price alone | Fixed charges, discount scope and feed-in costs change the total |
| Sign a fixed contract lightly and leave early | An exit fee is possible inside the term |
| Choose internet by the promo price | You ignore the price after the promo and the term |
| Cancel without proof | ACM advises getting confirmation and sending registered post if none comes |
| Skip the lease when rent includes utilities | The scope and settlement can bring extra charges |
The most common mistake is not keeping confirmation. Get contracts and cancellations confirmed in writing and save them.
Your own answers depend on your situation. For contracts and costs, ACM ConsuWijzer, your water company and your grid operator can help. This article is not individual advice.
14. What to do tomorrow
- Read your lease: are utilities included (inclusief) or not (exclusief)?
- Look up your grid operator at Mijnaansluiting.nl.
- Compare energy suppliers by postcode, with ACM's points in mind: fixed charges, discount scope and exit terms.
- Choose fixed, variable or dynamic, check the term and exit fee, and order.
- Check which internet lines reach you and order a few weeks before moving in.
- On key day, photograph the meters and apply to your water company.
- For an older meter, send the reading within 5 working days.
- Save contracts, start dates and confirmation emails.
15. Checklist
- Checked whether utilities are included in the rent
- Found the grid operator
- Chose a supplier and a price type
- Checked term, exit fee and the 14-day cooling-off
- Photographed meters on key day
- Applied to the water company
- Sent readings if the meter is an older type
- Checked the internet line and contract term
- Arranged to be home for installation
- Saved contracts and confirmations
16. Summary
- You can choose your energy supplier; the grid operator is set by area.
- The water company is set by address and you can apply from key day.
- Fixed, variable and dynamic differ in exit fees and how prices move.
- Photograph meters on key day and report older meters within 5 working days.
- The monthly amount is an estimate, and the annual settlement corrects it.
- For internet, check the line first, then the term (max 2 years) and the post-promo price.
- If rent includes utilities, read the lease for what is covered.
Sources used
Primary sources (authorities, government and providers' own pages)
- Electricity and gas — ACM ConsuWijzer: entry page for energy guidance
- Who is my grid operator — ACM ConsuWijzer: roles of grid operator and supplier, 0800-9009
- Tips for choosing an energy supplier — ACM ConsuWijzer: choosing a supplier; fixed, variable, dynamic
- Energy contract when moving — ACM ConsuWijzer: contracts and moving
- Cancelling an energy contract — ACM ConsuWijzer: exit fees and notice
- Meter readings on the energy bill — ACM ConsuWijzer: readings and the 5 working days
- The termijnbedrag — ACM ConsuWijzer: monthly advance and annual settlement
- Fixed and variable supply costs — ACM ConsuWijzer: fixed charges, notice on changes
- Cancelling or annulling an energy contract — ACM ConsuWijzer: the 14-day cooling-off
- ACM energy monitor, 15 November 2024: dynamic contract uptake
- When can I cancel a subscription — ACM ConsuWijzer: telecom terms, renewal, cancelling
- Can I choose any telecom provider — ACM ConsuWijzer: lines and providers by address
- Do I get the promised internet speed — ACM ConsuWijzer: speed statements and measuring
- From copper to fibre — ACM ConsuWijzer: the switch to fibre and connection costs
- Taking out or cancelling a fibre contract — ACM ConsuWijzer: contracts signed before building
- Choosing your own modem, router or decoder — ACM ConsuWijzer: own equipment
- Applying for drinking water — Rijksoverheid: applying and moving
- Moving — Dunea: water in The Hague area, applying and cancelling
- Mijnaansluiting.nl: finding your grid operator
- Map of water companies — Vewin: which company serves your address
- Fibre — KPN: fibre prices and terms
- How long does fibre installation take — KPN: street work and home connection
- How long does fibre take at home — Open Dutch Fiber: installation time and attendance
- Internet — Ziggo: cable plans and technician visit
- Smart meter — Milieu Centraal: smart meter installation
Expat media and news (used to confirm the steps)
- How to arrange your energy contract as an expat — Xpat.nl: when to give your new address, taking a contract with you
- Utilities, internet, taxes and other household bills — The Hague International Centre: inclusive or exclusive rent, documents, water in The Hague
- Gas and electricity in the Netherlands — ACCESS Netherlands: move-in steps, advances and direct debit
- Many people are overpaying for internet — DutchNews.nl, 16 January 2025: ACM findings on expired contract periods
- Rolling over your internet contract — DutchNews.nl, 9 February 2026: ACM's warning on prices after renewal
- Moving: arrange your internet — Consumentenbond: checking availability and remaining term (only part of the text could be read)
All were checked on 7 November 2026. Prices, rules and procedures change, so confirm current details with each provider and the official site before you sign.
FAQ
- When should I sign an energy contract after moving into a Dutch home?
- Choose and order your supplier before the key date, so the contract runs from the day you get the keys. A contract belongs to you, not the address, so ask whether your current one can move with you. Photograph the meters on key day.
- What is the difference between an energy supplier and a grid operator?
- The supplier sells you gas and electricity, sends the bill and is the company you can switch. The grid operator (netbeheerder) owns the cables, pipes and meters in your area. There is only one per area and you cannot choose it. Report outages to the grid operator.
- Should I choose a fixed, variable or dynamic energy contract?
- Fixed gives a stable price for the term but can carry an exit fee if you leave early. Variable and dynamic contracts have no exit fee. Variable prices change on set dates; dynamic prices follow the wholesale market every 15 minutes to a day, so they suit people who can shift usage.
- Why do I need to record meter readings on the day I move in?
- The readings separate the previous occupant's use from yours. Smart meters are read automatically, but with an older meter ACM says to pass the reading to your supplier within 5 working days of moving or switching. A dated photo is your proof if the final bill is wrong.
- Can I choose my water company in the Netherlands?
- No. Your water company is set by your address. You can apply to it from the day you receive the keys, so read the water meter that day and use the company's website. If your rent includes utilities, check in the contract who pays the water company.
- How do I choose between fibre, cable and DSL internet?
- Start with what actually reaches your address. Cable usually has one provider per area, DSL runs over KPN's copper line, and fibre may offer several providers. Then compare contract length (maximum two years), the price after the promo ends, installation dates and what happens if you move.